BAGNALL LogoBAGNALL LogoBAGNALL LogoBAGNALL Logo
  • Home
  • About
  • Projects
  • Contact
UKAEA Safety & Reliability Directorate Site
26/10/2020
Cheadle Royal Hospital
26/10/2020

Carrington Textiles

Value: £603k

Programme: 10 Days

The enquiry was initially received in the midst of the Covid-19 lockdown and as Carrington Textiles are the largest producer of workwear textiles in the UK, it was critical that we had the ability to respond quickly yet safely and in accordance with lockdown protocols, to ensure the client was able to continue to provide essential items, such as NHS and care-worker uniform and personal protective equipment.

We were appointed to make safe and secure a large textiles factory following significant fire damage. Once the fire had been successfully brought under control, we were then commissioned with managing the controlled disposal of 2,690 tonnes of bundled fabric waste and the demolition of all affected structures.

  • Before
  • During
  • During
  • After
Share

Search

Recent Posts

  • Lidl UK GmbH
  • Cheadle Royal Hospital
  • Carrington Textiles
© 2025 Bagnall Demolition. All Rights Reserved. Muffin group